The start!!!! The foundations being dug in May 2005. An old Georgian water tank was found and had to be dug out taking three lorry loads of concrete to fill.
|
Foundation walls completed and the oversite DPM in place.
|
 |
 |
The pre-cast concrete beams for the beam and block floor being swung into place.
|
The first sign of the timber frame! The sole plates being fixed.
|
 |
 |
The scaffolding goes up. This was very nearly forgotten and
DTM Group of Bodmin put it up on Saturday having received the order at
5pm Friday!
|
The first lorry load of timber frame arrives.
|
 |
 |
|
The Grand Design camera crew at work.
|
The 40 ton crane makes light work of lifting the steel and
panels over the scaffolding and into place.
|
 |
 |
More panels are fixed in place.
|
The roof goes on. The 18mm ply is an important structural element and is nailed, glued and then screwed.
|
 |
 |
Lee boils up the bitument ready for laying the 3-layer high performance felt roof covering.
| Bob rolling out the second felt layer.
|
 |
 |
Tiles for the North roof arrive.
|
The continuous aluminium gutter being rolled. The only joins on this system are at the corners and downpipes.
|
 |
 |
Alan fixing the abutment vents to the North roof.
|
Walls and roof in place.
|
 |
 |
North side interior walls.
|
South side showing main structural steels.
|
 |
 |
Interior of the flat roof showing I-beams,
steel and timber for platerboard.
|
The scaffolding has gone. Peter & Rupert are preparing for bad weather.
|
 |
 |
Temporary weatherproofing completed
(on the 9th September).
|
The packaged sewage treatment plant arrives.
|
 |
 |
Down she goes!
|
Peter (project manager and owner) proves that he does some work by painting a steel column.
|
 |
 |
Rupert and John cladding the North side.
|
The glass arrives from SolarGlass, Plymouth.
|
 |
 |
Grand Designs Director, Graham, films the unloading of the glass.
|
M.P.S. crew fitting one of the large (very heavy!!) windows.
|
 |
 |
Three cheers! - all the glass safely in place.
|
Grand Designs' Kevin McCloud talking to camera.
|
 |
 |
Rupert, Peter and Ryan discuss the finishing of the under floor heating pipes. Rupert's dog (Bear) waits for the heat.
|
The liquid screed is poured in place. It is magic to see waves of screed crossing the floor.
|
 |
 |
Snow in November! The house looks good from the outside.
|
The sheeps wool insulation arrives. It is much nicer to handle than the ususal material.
|
 |
 |
Sheeps wool in place. The ducting for the heat recovery ventilation system can be seen.
|
Kevin McCloud being filmed in the garden.
|
 |
 |
The feature wall is assembled in the sitting room.
|
The acoustic insulation in place ready for the plasterboard.
|
 |
 |
This huge lorry turned up with the plaster from France and a Polish driver who spoke no English. He became totally stuck in the Devon lanes - it took 3 hours to free the lorry!
|
Julian sprays on the first layer of the special thin coat plaster.
|
 |
 |
Jason and Julian (Plaster Faster, the local contractors) and Ivar (Alltek, the suppliers) spray on plaster. This is a superb method of finishing plaster board walls.
|
John White grouting the tiles in the wet room.
|
 |
 |
|
The Grand Design camera crew film the
start of the garden wall being rebuilt.
|
Ryan installs the glass wash basin in
the wet room.
|
 |
 |
|
Rupert and John constuct the under
framework for the decking.
|
Eric the electrician finishes the second
fix lighting.
|
 |
 |
| The roller blinds being installed. |
Asphalt being laid to finish the
courtyard front of the house.
|
 |
 |
|
Ed and Dave fix and check the master
bedroom furniture which they designed
and made.
|
The dining area, nearly finished.
|
 |
 |
The sitting room, nearly ready.
|
External shot, all done except window cleaning!
|